After assembly each switch Board, LT Panel and Bus Duct is thoroughly tested. Suitable tests are carried out to ensure continuity of operation. In-house tests cover the following:
Wiring Continuity Test
Insulation Resistance Test
Earth Continuity Test
Earth Resistivity Test
Testing of Polarity of non-linked Single Pole Switches.
Operation checks
Besides the above, any other test specified by the local authority shall also be carried out.